Abersea Engineering have designed, manufactured, installed & commissioned a BOP control system for a leading drilling contractor. All completed in only 5 weeks.

Due to the short yard stay and a growing scope of work in relation to the Jack-ups existing BOP Control system our client required a very quick turnaround. The system is fully API 16D compliant and was designed to be quickly retro fitted to the new BOP HPU. The system included two remote control stations, a local processing enclosure and sensor set.

The project itself shows the expertise we have in place and the ability to overcome design challenges and cut down time scales on work scopes. This requires working well as a team but also having everyone in the team playing their part to an exceptional standard.

Barry Canfield, Engineering Director: “Not only did we deliver it quickly, we likely saved the client a great deal of money in terms of offshore rates and system cost. We are consistently looking at lessons learned from projects, then implementing improvements that help achieve better efficiencies in terms of costs and time saving for our clients.

More and more clients are recognising the benefits of working with us. We now have customers who after working with us on one project and having an excellent experience are looking to us to save them money without the concern that quality is being jeopardised in any form.”